加纖維瀝青混凝土的拌和要求

來源:http://m.66975.cn/ 日期:2022-12-19
加纖維瀝青混凝土的施工方法與傳統(tǒng)瀝青混凝土的施工基本相同,分為進場材料檢驗、拌和設(shè)備的選型、拌和、攤鋪和碾壓一個工序進行,下面濟南瀝青混凝土生產(chǎn)廠家就來講講加纖維瀝青混凝土的拌和要求。
The construction method of fiber reinforced asphalt concrete is basically the same as that of traditional asphalt concrete, which is divided into one process: inspection of incoming materials, selection of mixing equipment, mixing, paving and rolling. Next, Jinan asphalt concrete manufacturer will talk about the mixing requirements of fiber reinforced asphalt concrete.
1、確定每盤熱料倉的配合比,計算出每盤混合料的質(zhì)量,根據(jù)目標配合比確定的纖維用量計算每盤混合料中投放的纖維質(zhì)量,然后按此質(zhì)量對進場的纖維進行分裝,包裝袋采用市場上常見的聚乙烯塑料袋即可。分裝過程中,保證稱量的準確性。纖維的摻加如示意圖:
1. Determine the mix proportion of each tray of hot material bin, calculate the quality of each tray of mixture, calculate the quality of fiber put into each tray of mixture according to the fiber consumption determined by the target mix proportion, and then pack the incoming fibers according to this quality. The packaging bags can be polyethylene plastic bags commonly used in the market. Ensure the accuracy of weighing during subpackaging. The addition of fiber is shown in the schematic diagram:
2、瀝青混合料應按設(shè)計瀝青用量進行試拌,試拌后取樣進行馬歇爾試驗,并將其試驗值與室內(nèi)配合比試驗結(jié)果進行比較,驗證設(shè)計瀝青用量的合理性,必要時可作適當調(diào)整:
2. The asphalt mixture shall be trial mixed according to the design asphalt dosage. After trial mixing, samples shall be taken for Marshall test, and the test value shall be compared with the indoor mix proportion test results to verify the rationality of the design asphalt dosage. If necessary, appropriate adjustments can be made:
濟南瀝青混凝土
3、確定適宜的拌和時間。對于普通的瀝青混合料,間歇式拌和設(shè)備每盤拌和時間為30~60秒,推薦的拌和時間為干拌25~30秒,濕拌30秒,以混合料拌和均勻,纖維和瀝青混合料裹覆良好為準;
3. Determine the appropriate mixing time. For ordinary asphalt mixture, the mixing time of each batch of intermittent mixing equipment is 30-60 seconds. The recommended mixing time is 25-30 seconds for dry mixing and 30 seconds for wet mixing. The mixture shall be evenly mixed and the fiber and asphalt mixture shall be well coated;
4、確定適宜的拌和與出廠溫度。瀝青(均指石油瀝青,下同)的加熱溫度宜為130℃~160℃,加熱不宜超過6小時,且當天加熱宜當天用完,不宜多次加熱,以免老化砂石加熱溫度為140℃~170℃,礦分不加熱。瀝青混合料的出廠溫度宜為130℃~160℃,當使用改性瀝青時,應比上述溫度的高限再提高10℃~15℃,纖維的摻加不必進行溫度調(diào)整。
4. Determine appropriate mixing and factory temperature. The heating temperature of asphalt (all refer to petroleum asphalt, the same below) should be 130 ℃~160 ℃, and the heating should not exceed 6 hours. The heating should be used up on the same day, and should not be repeated, so as to avoid the heating temperature of aging sand and gravel is 140 ℃~170 ℃, and the mineral is not heated. The factory temperature of asphalt mixture should be 130 ℃~160 ℃. When modified asphalt is used, it should be 10 ℃~15 ℃ higher than the upper limit of the above temperature. It is unnecessary to adjust the temperature when adding fiber.
此外加纖維瀝青混凝土路面成型過程中一般不會形成油斑,顏色外觀與普通瀝青混凝土路面基本相同。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://m.66975.cn進行咨詢了解吧!
In addition, the asphalt concrete pavement with fiber generally does not form oil spots during the forming process, and the color appearance is basically the same as that of ordinary asphalt concrete pavement. More relevant content will come to our website http://m.66975.cn Consult and understand!
  • 上一條:裝載機行駛過程中變速箱“跳”的應急方式
  • 下一條:帶你認識常見的路面機械設(shè)備
  • 相關(guān)產(chǎn)品:

    亚洲男人的天堂在线va| 思思久久96热在精品国产免费| 色爱一区| 国产精品亚洲aⅴ| 国产三级视频播放线观看| 亚洲色图欧美日韩亚洲| 四虎影酷免费观看国产| 色老头免费视频精品三区| 久久熟女| 国产特黄特色a级在线视频| 好爽毛片一区二区三区四| 国产日产欧产精品久久久久久 | 日韩人妻无码精品—专区东京热| 中文字字幕国产精品| 影音资源先锋| 九色九色| 欧美精品欧美人与动人物牲交 | 国产欧美精品区一区| 国产无遮挡又黄又爽免费网站| 国产又色又爽又黄的| 久久久免费精品RE6| 亚洲视频一本到| 97精品一区二区视频在线观看| 亚洲无线久久无线无码网| 偷拍自偷拍亚洲精品| 亚洲女被黑人巨大进入| 国精品无码一区二区三区在线观看| 日韩高清无码诱惑| 成人免费观看视频网站| 亚洲精品无码不卡在线播放| 日日夜夜精品免费| av在线黄色免费网站| 亚洲第一免费播放区| 国产精品久久久久久冰| 无码人妻精品一区二区东京热| 久久超碰97中文字幕| 中文字幕无码老司机| 欧美伊人精品| 国产精品无码久久久久久久久久| 青草无码视频在线观看| 无码成A毛片免费|